Most of the infrastructure required for construction is in the ground for phases 1 & 2. Sewer, Potable Water, Non-potable Water, and Power are available at the property line.
Internal roadways for the first two phases of the project are also in place and are designed to PennDOT specifications to support heavy truck traffic. Highway Occupancy Permtis are not required for internal roadways.